Lower initial investment for quicker profits
Lower aggregate capacity for lower energy consumption
Lower loader fuel consumption results lower operating costs
Modular design allows an installation time of only 4 days.
Major components can be quickly and easily relocated.
Small footprint requires less site space.
Enter and exit on both sides. Flexible layout allows setup on any site.
6 step protection system ensures safety during operation.
Ethernet connections for fast and reliable communications
Computer controlled manufacturing process